OPERATIONS

Estimated Resources

Sawn Lake Area Project

bitumen covering our screw pump

Photo of the bitumen (oil sands) covering our PCP screw pump that came out of our 4-32-91-12W5 well without the use of thermal recovery. This well has been cased and completed for future production and is located 0.5 km from the bottom hole location of the recently drilled SAGD well pair.

photo of four cores taken from well

Photo of one of four cores taken from our 9-16-092-13W5 well, which shows the black oil sands within the core.