Rig used to drill SAGD well pair.
Installation of Sales Tanks.
Construction of the SAGD Steam Facility
Installation of the Steam Generator
Pipeline crossing signs for the SAGD Project: fuel gas pipeline, water source pipeline, waste water disposal pipeline and buried power cable.
Inside of Motor Control Centre